Bungaribee Industrial Estate
Bungaribee Industrial Estate
Bungaribee Industrial Estate
Kimbriki Environmental Enterprises Administration Building

Kimbriki Environmental Enterprises Administration Building

Kimbriki Environmental Enterprises commissioned the demolition and construction of an administration building and carpark for their waste management facility. Our involvement included modelling the proposed carpark, roads and associated bulk earthworks. A temporary and permanent pavement plan was also included for the different stages of work. A swale system running along the northern boundary of site captures any external overland flow and reticulates through our proposed piped stormwater system.

Bungaribee Industrial Estate

The development of the Bungaribee industrial estates involved the construction of a distribution warehouse, office and administrative facilities, three (3) warehouse data centres and 2 separate carparks. The Warren Smith Consulting Engineers design outlined stormwater drainage works required, a water quality treatment system and the road/car park design. The rainwater captured on site is to be reused for minimum 80% of all WC flushing and irrigation requirements as per council standard.

1 Inglis Road, Ingleburn

The Schneider Electric Warehouse is located in the industrial zoned area in Ingleburn and has proposed for development the extension of its warehouse and construction of a new external carpark, loading dock and hardstand areas. 50% of the site catchment will drain through a 50kL rainwater tank and be used for WC flushing purposes. The remaining catchment will be captured through the pit and pipe system and drained through a bioretention pond before discharging to the council system. The pond will serve the dual purpose of reducing the rate of flow and treating the water to council approved standards prior to discharge.

Warren Smith Consulting Engineers